In August of 2018, the City selected Donohue to serve as their engineering consultant for the development of the second phase of their WWTP expansion project, in accordance with their combined sewer outfall (CSO) Consent Decree and associated Long Term Control Plan (LTCP).
Donohue presented the City with the cost-saving concept of constructing cloth-media disc filters (CMDFs) to treat wet-weather flows (in excess of 30 mgd). This alternative was selected in lieu of increasing the primary clarification capacity and directing up to 60 mgd of sustained wet-weather flow through the entire WWTP process, as was indicated in the existing LTCP. Given the WWTP’s current average day flow of 10.5 mgd, the previously unreferenced concerns of hydraulically overloading the secondary treatment process, and the associated 28.5% cost savings, the City decided to explore the CMDF installation scenario.
Donohue consulted and coordinated with CMDF manufacturers and worked with the City to conduct 5-micron CMDF pilot studies in the Fall of 2018 and the Spring of 2019. In parallel, Donohue worked with the City and their legal consultants to prepare documentation to present to the Indiana Department of Environmental Management (IDEM), United States Environmental Protection Agency (EPA), and Department of Justice (DOJ) for consideration of the CMDF technology as an equivalent treatment technology to the plan laid out in the LTCP.
Over the course of approximately 14 months, Donohue worked in conjunction with the City and their legal consultant to develop several rounds of letters and supporting data analysis, graphs, and documentation for consideration by IDEM, EPA, and DOJ, which led to a December 2019 meeting. This meeting resulted in regulatory consent of the project proceeding with the CMDF technology, given additional WWTP improvement assurances, which the City was already considering due to the cost-savings that would be achieved through the construction of CMDF facilities in lieu of the additional primary clarifiers and associated pumping facility.
In January of 2020, the City directed Donohue to proceed with preparation of construction bid documents for construction of a new, wet-weather CMDF treatment process, as well as improvements to the existing Primary Clarifiers, Primary Sludge equipment, Aeration Process, RAS facilities, and other associated WWTP components. In addition to the ongoing preparation of the bidding documents, Donohue was also tasked by the City with updating the 2018 Preliminary Engineering Report (PER).
The construction documents were prepared in accordance with the Indiana State Revolving Fund (SRF) Loan Program, which the City utilized for this project.