The City of Carlton, Minnesota completed a major upgrade to its water treatment infrastructure. Donohue designed and oversaw the construction of a new 300-gpm water treatment facility, a new supply well, and improvements to the city’s water distribution system.
The project was necessary to replace an aging gravity filtration system and address issues with iron, manganese, and arsenic removal. The new treatment plant uses a process of preoxidation with aeration and chlorine, followed by gravity filtration using synthetic greensand media, and final disinfection with chlorine and hydrofluosilicic acid.
The redundant supply well replaces an emergency well with poor water quality and increases the overall capacity of the system to accommodate future growth and expansion, including a planned water main extension to the neighboring community of Twin Lakes Township.
To fund the project, the City of Carlton secured a $3.7 million grant from the Water Infrastructure Fund (WIF) and a $2.2 million loan from the Drinking Water Revolving Fund. After the new water plant and well were completed, the companion water main extension project to Twin Lakes Township was constructed.
This project has modernized Carlton’s water treatment and distribution infrastructure, improving water quality, increasing system capacity, and laying the groundwork for future growth and regional water sharing.