The Town of New Carlisle, Indiana has relied on Donohue for engineering services related to their 3.0 mgd water treatment plant (WTP) for many years. The WTP, commissioned in 1989, is a unique groundwater treatment facility featuring two redundant, nearly identical lime softening treatment trains. Additionally, the WTP employs ion exchange and reverse osmosis treatment to produce higher quality, finished water streams to meet the needs of nearby industries and the New Carlisle population.
Donohue has developed various plans, assessments, and improvements for the WTP, as well as providing on-call services and project management. These projects are driven by the expansion of the Indiana Enterprise Center (IEC), a high-growth industrial development area within the Town’s Water Utility service area. Due to the IEC’s development, the Water Utility’s demands are projected to significantly exceed the current treatment capacity in the coming years.
Donohue has collaborated with various stakeholders, including existing and potential industries, to identify demand requirements.
These efforts culminated with a strategic plan and conceptual design that involves replacing one of the WTP’s lime-softened water treatment trains with new iron and manganese removing pressure filters. This solution is expected to reduce the WTP’s unit operating costs while increasing the WTP’s firm capacity by 413% to a total of 12.4 mgd (3.3 mgd via lime softening and 9.1 mgd via pressure filtration).