Water Main Extension: Kenosha, Wisconsin

Donohue prepared the design for a water main extension for the Kenosha Water Utility (KWU). The Kenosha Water Utility has been experiencing issues with a dead-end water main on the City’s west side. Issues have consisted of inadequate fire flows and transient pressure spikes within the water distribution system. A new 16-inch diameter water main approximately 9,700 feet in length was designed to loop the system. The new loop will also serve future growth in the western planning area. The water main extends north from a 16-inch stub at the water storage tank to 60th Street (CTH K) along the western edge of the 122nd Avenue right-of-way. The water main is located in a new easement obtained by KWU. The water main then extends west along 60th Street (CTH K) to 128th Avenue and north on 128th Avenue for approximately one mile and terminates by connecting to an existing 16-inch water main stub. The new water main connects to an existing 24-inch water main at the intersection of 122nd Avenue and 60th Street (CTH K).

As part of the design effort, Donohue performed a routing analysis to establish conceptual water main alignments. The alignments consider the location of existing utilities, property lines, traffic and business impacts, environmental impacts, and constructability. WDNR mapping shows potential wetland areas on 60th Street and 128th Avenue. Wetland indicator soils exist along portions of the entire project corridor. To the extent practical, the water main route minimized disturbance of wetland areas. The water main crossed an unnamed creek which crosses 128th Avenue.

Trenchless construction methods (HDD) were used to cross environmentally sensitive locations where feasible. 

Kenosha, WI - Map Aerial
Kenosha, WI - Map Aerial