The City of Sault Ste. Marie, Michigan, has relied on its wastewater treatment plant and collection system to serve residents and businesses since 1961. While the facility underwent a major expansion in 1980, much of the infrastructure had reached the end of its useful life, resulting in undersized processes, operational inefficiencies, and significant inflow and infiltration (I&I) during wet weather events.
To address these challenges, the City partnered with Donohue to evaluate the existing system and develop a phased capital improvement program. Supported by funding through Michigan’s Clean Water State Revolving Fund (CWSRF), the program is modernizing the treatment plant and reducing collection system impacts while restoring long-term reliability.
Phase 1 (Completed)
Phase 1 focused on stabilizing plant operations and addressing the most critical deficiencies. Donohue led upgrades to aging headworks and treatment systems, improving reliability and operator control while establishing a strong foundation for future work.
Key improvements included:
These improvements restored dependable operation to the facility and significantly improved monitoring, safety, and treatment consistency.
Phase 2 (Completed)
With most core systems stabilized, Phase 2 expanded improvements across additional treatment processes and plant infrastructure. Donohue’s work enhanced treatment performance, strengthened system resiliency, and addressed remaining aging equipment.
Major work included upgrades to primary and secondary treatment, improvements to biosolids handling, and modernization of electrical and support systems. Highlights included:
By the end of Phase 2, the plant was operating with improved efficiency, safety, and compliance, positioning the City for long-term performance and reduced operational risk.
Phase 3 (In Progress)
Phase 3 is currently underway and focuses on optimizing solids treatment and strengthening disinfection capacity to meet future demands. Donohue is leading these improvements with an emphasis on long-term sustainability, operational resilience, and regulatory compliance.
Work in this phase includes:
As Phase 3 progresses, these improvements continue to build on prior investments, ensuring the facility is prepared to meet evolving standards and serve the community reliably for decades to come.
Delivering Long-Term Value
Across all three phases, Donohue has delivered, and continues to deliver, integrated engineering services spanning as well as programming services for the new plantwide SCADA system. This coordinated approach has transformed the City’s wastewater infrastructure, restoring treatment capacity, reducing system vulnerabilities, and improving operational efficiency.
Together, these efforts represent a long-term investment in resilient, modern infrastructure that protects the environment and supports the Sault Ste. Marie community.