Transforming Wastewater Infrastructure
One Phase at a Time

Sault Ste. Marie, Michigan

The City of Sault Ste. Marie, Michigan, has relied on its wastewater treatment plant and collection system to serve residents and businesses since 1961. While the facility underwent a major expansion in 1980, much of the infrastructure had reached the end of its useful life, resulting in undersized processes, operational inefficiencies, and significant inflow and infiltration (I&I) during wet weather events.

To address these challenges, the City partnered with Donohue to evaluate the existing system and develop a phased capital improvement program. Supported by funding through Michigan’s Clean Water State Revolving Fund (CWSRF), the program is modernizing the treatment plant and reducing collection system impacts while restoring long-term reliability.

Phase 1 (Completed)

Phase 1 focused on stabilizing plant operations and addressing the most critical deficiencies. Donohue led upgrades to aging headworks and treatment systems, improving reliability and operator control while establishing a strong foundation for future work.

Key improvements included:

  • Replacement of screw pumps, screening equipment, and grit removal systems
  • Secondary treatment improvements, including clarifier replacements
  • Construction of a new chemical feed building
  • Conversion from gaseous chlorine to (sodium hypochlorite) disinfection
  • Implementation of a facility-wide SCADA system
  • Associated structural, mechanical, electrical, and controls upgrades

These improvements restored dependable operation to the facility and significantly improved monitoring, safety, and treatment consistency.

Phase 2 (Completed)

With most core systems stabilized, Phase 2 expanded improvements across additional treatment processes and plant infrastructure. Donohue’s work enhanced treatment performance, strengthened system resiliency, and addressed remaining aging equipment.

Major work included upgrades to primary and secondary treatment, improvements to biosolids handling, and modernization of electrical and support systems. Highlights included:

  • Primary treatment enhancements such as clarifier improvements and scum system upgrades
  • Replacement of rotating biological contactor (RBC) systems and supporting equipment
  • Addition of a sodium bisulfite dechlorination system
  • Electrical upgrades, including replacement of motor control centers
  • Installation of a new belt filter press for biosolids handling
  • Digester facility improvements and key building upgrades
  • Replacement of the plant heating system, to include a dual fuel (natural gas or biogas) boiler.

By the end of Phase 2, the plant was operating with improved efficiency, safety, and compliance, positioning the City for long-term performance and reduced operational risk.

Phase 3 (In Progress)

Phase 3 is currently underway and focuses on optimizing solids treatment and strengthening disinfection capacity to meet future demands. Donohue is leading these improvements with an emphasis on long-term sustainability, operational resilience, and regulatory compliance.

Work in this phase includes:

  • Rehabilitation of primary and secondary digesters with new covers, and improved mixing and heating
  • Installation of a gas treatment system to utilize biogas for plant heating needs
  • Installation of a new waste gas burner
  • Construction of a second chlorine contact tank to provide required detention time
  • Refinements to chemical dosing systems to enhance treatment performance

As Phase 3 progresses, these improvements continue to build on prior investments, ensuring the facility is prepared to meet evolving standards and serve the community reliably for decades to come.

Delivering Long-Term Value

Across all three phases, Donohue has delivered, and continues to deliver, integrated engineering services spanning as well as programming services for the new plantwide SCADA system. This coordinated approach has transformed the City’s wastewater infrastructure, restoring treatment capacity, reducing system vulnerabilities, and improving operational efficiency.

Together, these efforts represent a long-term investment in resilient, modern infrastructure that protects the environment and supports the Sault Ste. Marie community.