Rock Run Sewer Improvements: Goshen, Indiana

The purpose of the Rock Run Sewer Improvement project was to provide relief sewer capacity to the existing Rock Run Interceptor. This new gravity sewer was the first of five phases that would replace the existing Rock Run Sewer Interceptor, which runs parallel to Rock Run Creek.

The design included a 42-inch interceptor sewer (approximately 1,400 feet), a new 24-inch collector sewer (approximately 600 feet), a triple barrel sewer siphon under Rock Run Creek (approximately 260 feet), jack and boring under SR-15 (approximately 120 feet), and various storm sewer modifications. Also included were curb and gutter, sidewalk, and pavement improvements along Main Street, between Rock Run Creek and approximately 500 feet to the north.

To reduce hydraulic bottlenecking, the design directs wastewater to the new 42-inch gravity sewer through new 24-inch diameter collector sewer. The new sewers are configured in a way that eliminates aerial crossings over Rock Run Creek and significantly reduces maintenance and infiltration issues. The size of the sewer, including restrictive workspace, a brownfield crossing, park impacts, trail impacts and associated improvements, and a significant river crossing presented many challenges.

The project was designed, bid, and constructed in conjunction with two other wastewater capital improvement projects. Additional engineering-related services included permitting, SRF coordination, bid phase services, and construction phase services.

Goshen, IN - Sewer Construction
Goshen, IN - Sewer Improvements
Goshen, IN - New Elevated Dock
Goshen, IN - Manhole
Goshen, IN - Sewer Improvement