Flood Control Project: Metropolitan Water Reclamation District of Greater Chicago, Robbins, Illinois

Robbins is a historically important south suburb of Chicago. Located near the mouth of Midlothian Creek at the downstream end of the watershed tributary to the Little Cal River, the Village has experienced increased flooding terms of both intensity and frequency. The Metropolitan Water Reclamation District of Greater Chicago’s (District) Detailed Watershed Plan (DWP) for the Little Cal River identified the problem as a high priority. Up to 140 acres of the Village were at risk of flooding. In addition, a major state road, Kedzie Avenue, is forced to shut down at least once a year due to water on the pavement.

With a team of subconsultants including 2IM Group, Living Habitats, SOM, Accurate Group, and O’Brien and Associates, Donohue led the evaluation of a range of potential solutions. Using HEC-RAS modeling, the team quickly identified that the extent of the problem was greater than originally identified in the DWP, but consistent with the Village’s reported flooding frequency. A confluence of increasing flows, conveyance restrictions, and topography limited potential options. While Donohue identified flow equalization as the most effective option, the Village preferred to avoid traditional dry-bottom, isolated detention.

In addition, the Village has suffered through an extended economic downturn. Recognizing a unique opportunity, the District, supported by the Donohue team, engaged a broad range of regional governmental and non-governmental agencies to create a solution that integrates the flood control project into the Village’s long-term plans and goals for redevelopment and capacity building. Agencies engaged included the Chicago Metropolitan Agency for Planning (CMAP), South Suburban Mayors and Managers Association (SSMMA), Regional Transit Authority (RTA), Cook County Housing Authority, Cook County Department of Transportation, and many others. Working closely with the Village, the District and the Donohue team developed a flood control plan that integrated flood control improvements with a community open space/park, a future transit oriented development (TOD), and redevelopment of a former industrial area for job creation. 

The final stage includes detention, diversion to the Cal-Sag Channel, streambank improvements, and green infrastructure in lieu of local drainage improvements. The proposed wetland park will provide approximately 8 acre-feet of detention storage for the 100-year event. The Diversion Channel will convey 383 cfs during the 100-year event, helping to reduce high flows in Midlothian Creek. A system of rain gardens and bioswales will improve local drainage west of Kedzie Avenue.

All these improvements were integrated into a new naturalized wetland park. Planned with a series of community surveys, meetings, and work groups, the park provides space to allow future community amenities including a playground, natural amphitheater, athletic fields, and an event facility. Amenities included in the original construction designed by the Donohue team include walking trails, vehicle access drives, and a kayak launch at the connection of the diversion channel to the Cal-Sag Channel.

Phase 1 design of the project, the diversion channel, was completed in 2023 with construction completed in spring of 2024. Phase 2 construction of the project began in late spring 2024.  Following completion of both phases of the project, a Letter of Map Revision was produced to remove almost 100 structures from flood hazard areas.

Roadways Aerial