PFAS Feasibility Study: La Crosse, Wisconsin

The City of La Crosse Water Utility (Utility) retained Donohue to assess, develop, and implement a strategy to address perfluoroalkyl and polyfluoroalkyl substances (PFAS) from water produced by three wells. The objective of the study was to provide the Utility with an impartial, life-cycle cost assessment of a strategy to address PFAS, considering the specific perfluoroalkyl and polyfluoroalkyl compounds to be removed, well water quality, existing Utility infrastructure, anticipated water demand, and site constraints. 

The first task of the study was to establish a basis of design to include the flow rates to be treated, the influent water quality characteristics, and the effluent water quality goals. The next task involved an initial screening of treatment alternatives (both proven and innovative) and other possible strategies for addressing PFAS. In addition to granular activated carbon (GAC) and ion exchange (IX), other innovative technologies were explored, such as a heat exchange reactor process. The Donohue team, in collaboration with the Utility, identified and selected the alternatives appropriate for the treatment goals defined in the previous task. 

In addition to treatment, other strategies evaluated for addressing PFAS include distribution system improvements to deliver water from the greater water system and the addition of storage to serve the area currently served by the three wells. Construction of new well(s) drawing from an alternative aquifer or a different part of the City was also considered. 

Well and pump evaluations were conducted as part of the project and included consideration of electrical upgrades needed to accommodate treatment systems or new well construction. A multi-factor analysis, including capital and operating costs and non-economic considerations, was performed on the treatment and non-treatment alternatives. One key factor for the Utility was power cost as they seek to minimize electrical costs by utilizing off-peak energy.  

Ultimately, the City selected distribution system improvements consisting of a new transmission main to deliver water from the City’s central wells and reservoir to the north part of the system formerly served by the wells containing PFAS. Donohue is currently designing the 2-mile long, 24-inch transmission main that will provide an additional river crossing and improve system resilience. 