The City of Kokomo was selected by the partnership of Stellantis/Samsung for the development of up to four new electric vehicle battery plants (StarPlus Electric). This development was located in the Northeast quadrant of the City, which had very little sanitary sewer collection infrastructure available.
Considering the system constraints, the City hired Donohue to develop a Master Plan to identify how the new development area could be served with new sanitary systems, including the identification of potential alignments, flows, and sewer sizes.
The Master Planning efforts identified peak flows from the water intensive battery plant processes could reach 5.76 mgd, with a projected peak flow of the entire development area of 7.13 mgd (average day flow of 4.47 mgd). Five different connection points to existing sewers were identified, with proposed new sewers ranging in size from 8 inches to 24 inches in diameter to accommodate the anticipated new flows. A total of 19,000 feet of new sewer was identified for the full buildout of the development area.
When the Master Planning efforts identified the needed sanitary sewer extensions and improvements, Kokomo hired Donohue to provide an expedited design of the sanitary sewer extensions required to service the first phase of the StarPlus development. The design included 6,196 linear feet of new sewer ranging in size from 8 inches to 24 inches in diameter. The design also included 75 feet of 24-inch steel casing (with a 15-inch carrier sanitary pipe) to be jack and bored in order to avoid difficult and expensive utility conflicts that would have resulted from open cut installation.
The design of the sanitary sewer extension project included milestones to meet the needs of the StarPlus development and coordination with five other concurrent projects.