New Water Reclamation Facility: Ixonia, Wisconsin

The Town of Ixonia Utility District No. 1’s previous wastewater treatment facility was overloaded and no longer meeting WPDES permit requirements. The Town retained Donohue to prepare a Facility Plan Report evaluating current and future treatment needs and recommending a solution.

Donohue recommended the construction of a new Water Reclamation Facility and assisted the Town with the selection of a new site located southeast of the intersection of Highway 16 and River Valley Road. After receiving approval from the Wisconsin DNR, Donohue was retained to design the facility, prepare bidding documents, assist with bidding, and oversee the construction project. The facility was designed for ease of future expansions as the utility district grows.

The liquid treatment train consists of an oxidation ditch activated sludge process with selector tanks for enhanced biological phosphorus removal, two clarifiers, space for future tertiary filters, ultraviolet disinfection, and post aeration prior to discharge to the Rock River. Solids handling includes waste activated sludge pumping, liquid biosolids storage, pump mixing, and loadout for beneficial reuse through biosolids land application. The project included site grading, paving, sidewalks, fencing, and lighting for the new water reclamation facility. Donohue’s construction services included overseeing start up and commissioning for the facility, as well as preparation of an operation manual.

The resulting new facility built in the middle of an agricultural field will serve the Town well for decades to come. This is attested to by Nathan Cassity, Donohue’s Project Manager for the venture, who noted, “After several years of planning, design, and construction, we are proud to have reached our goal of returning clean effluent back to the watershed.”

Ixonia, WI - Oxidation Ditch
Ixonia, WI - Sanitary Sewer
Ixonia, WI - Oxidation Ditch
Ixonia, WI - Flowing Water