Jordan River Storm Culvert Reconstruction: Bloomington, Indiana

An undersized existing stormwater culvert and increasing flows left the City of Bloomington needing to replace existing insufficient and aged infastructure. Although adjacent sections of the culvert had been replaced over the last 15 years, the remaining section posed many challenges. Donohue was retained by the City to prepare design documents and assist the City with construction related services.

The portion of the culvert that was in need of reconstruction included an 1,850-foot section of the Jordan River Culvert, located between Washington Street and north of 4th Street, through commercial lots, residential lots, city park, and under roadways. The culvert connects previously constructed sections on the north and south end. The existing Jordan River culvert was varying in width (16 to 20 feet) by varying in height (4 to 6 feet) and was constructed of concrete, masonry and stone sides and top, with a bottom of native rock. One portion even had a stone arch. The new Jordan River culvert is varying in width (20 to 24 feet wide) by 5 feet high and constructed of precast and cast-in-place three-sided concrete culvert with a poured in place concrete base section. The new culvert is anticipated to convey an 1,800 CFS peak capacity. 

In order to accommodate realignment of the culvert, water main, sanitary sewer and storm sewer facilities required realignment and replacement. This included 8-inch water main on Smith Avenue, Lincoln Street, 3rd Street, and 4th Street. Sanitary sewer ranging from 8-inch to 27-inch with a triple barrel siphon (8 inches, 12 inches, and 14 inches) parallel to Smith Street.  Major sanitary sewer trunklines were constructed on both sides of the culvert to accommodate the inability to cross the culvert with sewer services.  Storm sewer inlets along with culvert connections were also reconstructed.

The significant width of the culvert replacement had serious impacts on existing utilities.  The most serious being a large telephone duct which had to be reconstructed under the culvert. This meant that the utility would have to work with the Contractor to reconstruct this duct during construction, as trenchless installation could not occur due to the high bedrock elevations.

The project also included streetscaping upgrades to sidewalks, walls, landscaping, curbs, and traffic signals to improve pedestrian facilities and traffic calming.

Donohue provided design, permitting, and construction services for the project, utilizing subconsultants for geotechnical, survey, and easement preparation work.

Bloomington, In - Construction Workers Working on Rebar Ditch
Bloomington, In - Rebar Ditch