The City of Wyoming operates numerous pump stations throughout its wastewater and stormwater systems, including the 1.5 million gallons per day (mgd) Jackson Park Stormwater Pump Station. This pump station, which was 40 to 50 years old, was approaching the end of its useful life, and all of its major components required significant overhaul to maintain minimum operating standards.
Adding to the complexity of the situation, the pump station is located in the corner of Jackson Park, which was undergoing a major renovation. The park improvements included the addition of athletic fields, a splash pad, and a natural wetland area. As a result, any changes made to the pump station had to consider the overall aesthetic impact it would have on the park.
To address this challenge, the City of Wyoming retained Donohue to provide design, bidding, and construction services for the replacement of the existing pump station. Before beginning the design, Donohue conducted a comprehensive pump station Alternative Analysis to ensure that the “correct” pump station was selected and installed.
Three styles of pump stations were reviewed as part of the Alternative Analysis 1) Top-Mounted Suction Lift Style Station; 2) Submersible Pump Station; and 3) Underground “Can” Station.
Each option presented its own unique advantages and drawbacks across various categories, including capital costs, constructability, aesthetics, operations, and maintenance. This thorough analysis allowed the City of Wyoming to have confidence that the selected pump station would adequately meet their needs, be easy to maintain, and make the best use of taxpayer funds. Ultimately, the City selected the top-mounted suction lift style pump station, manufactured by Smith and Loveless. The pump station has been installed with Donohue providing engineering services during construction.