The Kenosha Water Utility (KWU) delivers essential water and wastewater services to over 100,000 residents and businesses. To support its wastewater conveyance network, KWU operates 13 lift stations that direct flow to its wastewater treatment facility. Among these is the Industrial Park Lift Station (IPLS), which had aging infrastructure and equipment in need of significant upgrades. The station typically handles an average dry weather flow of 300 gpm, with peak daily flows reaching up to 1,700 gpm.
In 2018, KWU and Donohue & Associates conducted an evaluation of the IPLS. Integral upgrades identified included structural enhancements, pump and force main replacement, valve and piping improvements, a new generator, and electrical system modernization, among other facility enhancements. To ensure uninterrupted service during construction, the improvements were strategically implemented in two phases.
Phase I prioritized the most critical needs. Two new, high-capacity replacement pumps were installed, increasing the station’s pumping capacity to 4,800 gpm. The original 8-inch force main was replaced with a 16-inch line to accommodate the higher flows. Electrical systems, including lift station controls, were modernized, and the outdated, failure-prone piping and valve assemblies were fully replaced. Additionally, the original 150-kW indoor generator and associated equipment were removed and replaced with a 300-kW unit relocated from another site. The relocated generator was installed on an exterior pad for improved backup power capacity.
Phase II addressed remaining infrastructure needs. This phase included the replacement of the wet well’s grating with fiberglass-reinforced plastic grating and structural supports. The wet well’s concrete was rehabilitated, the dry pit elevator was replaced, a permanent bypass pumping vault was installed, and temporary bypass pumping was deployed for an eight-week period.
Through these phased improvements, KWU aligned the IPLS with modern operational standards and enhanced the long-term reliability of KWU’s wastewater collection system.