Donohue completed the design of major improvements to the wet weather pumping and treatment facilities located at the Water Pollution Control Plant (WPCP) in Fort Wayne, Indiana. Major project elements included:
During Phase I of the project:
Phase I included the construction of a new WWPS Screen Facility and modifications to the existing WWPS Discharge Structure. The WWPS Screen Facility included:
The WWPS Screen Facility was constructed at the location of the existing discharge channels adjacent to the WWPS Discharge Structure before flow is conveyed to Wet Weather Pond No. 1. Provisions were made to allow the addition of two additional bar screens; these screens were designed in Phase II of the project.
A new WWPS Electrical Building houses electrical and control equipment including medium voltage switchgear, VFDs, MCCs, PLC, an HMI station, and other electrical equipment. The cooling system was expanded in Phase II for the increased load due to the addition of two larger VFDs. A new WWPS Storage Building was also included to house City vehicles, boats, and other equipment.