Fond du Lac Avenue Water Booster Station Replacement and Roadway Reconstruction: City of Sheboygan Falls, Wisconsin

Donohue partnered with the City of Sheboygan Falls to replace the water booster station along Fond du Lac Avenue and to reconstruct the roadway from Oak Street to Rangeline Road. These efforts modernized critical infrastructure, addressed long-standing operational issues, and enhanced public safety and transportation access.

Built in 1951, the water booster station delivers water to the Western Avenue elevated storage tank. A 2040 Water System Study revealed that aging pumps, mechanical piping, and electrical components had reached the end of their useful life. Donohue performed an alternatives analysis to determine if rehabilitation or building a new booster station would be the best path forward. Once the decision to build a new station had been made, Donohue began the design process. Features included a new, modern pump station building with an overhead door, new electrical equipment, cement-lined ductile iron piping, and a natural gas backup generator. Demolition of the existing building was included, as well.

Donohue also provided construction-phase services that included the following: meeting facilitation, contractor guidance and review of contractor documents, on-site visits, preparation of a punch list, closeout assistance, generator and pump start-up services, and assistance with the Safe Drinking Water Loan process.

Additionally, Donohue played an integral role in the reconstruction of Fond du Lac Avenue. The project included roadway replacement and extensive upgrades to the stormwater systems and the water distribution system. The reconstructed roadway included two traffic lanes, two bike lanes, a parking lane, and sidewalk on both sides. To mitigate frequent flooding at the Oak Street intersection, stormwater improvements involved replacing the undersized storm sewer, adding inlets, and slope stabilization at the outfall. Sanitary sewer and water main facilities were replaced based on age and condition. The 10-inch cast iron water main constructed alongside the original booster station was replaced with a new 12-inch PVC water main.

Key intersection improvements were also included to enhance traffic safety. At the Poplar Street intersection, all-way stop control was implemented and a sweeping westbound curve was reconfigured to improve visibility and calm traffic.

Donohue’s construction-phase services included contract administration; project management; facilitation of project meetings; construction observation; preparation of conformed to contract documents; and management of contractor requests for information, clarifications, and design interpretations. The team also reviewed change orders and provided on-call survey services.

Together, these projects represent a significant reinvestment in the City of Sheboygan Falls’ water and transportation infrastructure. Donohue is proud to support the City throughout the entire process.