The Western Lake Superior Sanitary District (WLSSD) and Donohue collaboratively developed an Energy Master Plan that will serve as a dynamic and living energy “roadmap.” The purpose of this roadmap is to guide the transformation of the District to energy independence. This shift is consistent with the national movement for utilities to become the District of the Future: shifting from net resource consumers to net resource producers. The roadmap outlined a strategy to implement HVAC efficiency (heat conservation) improvements, biogas conditioning, biogas utilization (engine generators, waste heat recovery, and biogas-fueled boilers), and a hauled-in, high-strength waste (HSW) program to supplement present-day biogas production.
After developing the roadmap, the District retained Donohue to design a new natural and digester gas boiler system, and a biogas conditioning system. The biogas conditioning system was sized to accommodate additional biogas production from HSW receiving and co-digestion, offering complete redundancy for present-day biogas production rates and the potential to condition biogas production rates twice present-day rates. The District subsequently retained Donohue to design improvements to the Main Electrical Switchgear to address aging gear and better accommodate biogas fueled engine generators (two 825kW). The District is currently contracting with Donohue to design the installation of the two 825kW engine generators and siloxane removal.
The next stop along the energy roadmap is a high-strength waste (HSW) receiving, equalization, and feed system. During the course of the previous projects, Donohue worked with the District to develop a preliminary HSW receiving, equalization, and feed system design and locate it on the constrained site.