Water Storage Tank and Transmission Main Improvements: Greenfield, Indiana

Greenfield, IN Water Tower

Donohue provided professional engineering services to support critical water system improvements for the City of Greenfield, Indiana. The projects focused on replacing aging infrastructure, improving system reliability, and supporting the City’s long-term water storage and distribution needs. Services included planning, design, permitting, and preparation of bid-ready construction documents in compliance with Indiana regulatory and funding […]

Fond du Lac Avenue Water Booster Station Replacement and Roadway Reconstruction: City of Sheboygan Falls, Wisconsin

Sheboygan Falls, WI - Fond du Lac Avenue New Booster Station

Donohue partnered with the City of Sheboygan Falls to replace the water booster station along Fond du Lac Avenue and to reconstruct the roadway from Oak Street to Rangeline Road. These efforts modernized critical infrastructure, addressed long-standing operational issues, and enhanced public safety and transportation access. Built in 1951, the water booster station delivers water […]

New Water Treatment Plant with PFAS Treatment: Wausau Water Works, Wisconsin

Wausau, WI - Plant Exterior

2025 Engineering Excellence Best of State Award Wausau Water Works and the Donohue/Becher-Hoppe team received an American Council of Engineering Companies (ACEC) Wisconsin Best of State Engineering Excellence Award for the New Water Treatment Plant with PFAS Treatment project. The award was presented at the ACEC WI 2025 Awards Banquet on May 2 at the […]

PFAS Feasibility Study: La Crosse, Wisconsin

La Crosse, WI - Dock at Sunset

The City of La Crosse Water Utility (Utility) retained Donohue to assess, develop, and implement a strategy to address perfluoroalkyl and polyfluoroalkyl substances (PFAS) from water produced by three wells. The objective of the study was to provide the Utility with an impartial, life-cycle cost assessment of a strategy to address PFAS, considering the specific […]

Water System Improvements: New Carlisle, Indiana

Droplet of water splashing out of body of water

The Town of New Carlisle, Indiana has relied on Donohue for engineering services related to their 3.0 mgd water treatment plant (WTP) for many years. The WTP, commissioned in 1989, is a unique groundwater treatment facility featuring two redundant, nearly identical lime softening treatment trains. Additionally, the WTP employs ion exchange and reverse osmosis treatment […]

PFAS Treatment Evaluation: Lake County, Illinois

Automatic Sprinkler System Watering the Lawn

Donohue is currently working with the Lake County Public Works (LCPW) to identify potential treatment solutions for the presence of PFAS that may exist in their drinking water and wastewater systems. The project includes eight public water systems (PWS) and three water reclamation facilities. Drinking Water System PFAS Study The water systems in this study […]

Water Master Plan and Water/Sewer Rate Study: Addison, Illinois

Addison, IL - Building Exterior

The Village of Addison, which is home to just under 40,000 residents, distributes drinking water through its water system, which consists of water main, two booster pump stations, five water towers, and five pressure adjusting stations. In addition, the Village maintains six wells, which are used as a backup water supply in the event of […]

South Pressure Zone – System Improvements: South Bend, Indiana

South Bend, IN - Water Treatment Tanks

The City of South Bend retained Donohue to identify, assess, design, and bid Water Treatment and Distribution improvements for the South Pressure Zone. The goal was to provide reliable and redundant water sources, as the zone historically relied on a single, deteriorating 40-year-old pumping station (Fellows Booster Station) and its associated seven-million-gallon ground storage tank. […]

Water Treatment Plant Dehumidification Upgrades: Wyoming, Michigan

Wyoming, MI - Equipment Control Panels

The City of Wyoming owns the Donald K. Shine Water Treatment Plant (WTP) with a maximum capacity of 120 mgd. The plant serves the City of Wyoming and 10 other communities, with a total population of 230,000 people. Donohue was initially hired to evaluate and recommend alternatives for repairing or replacing the existing dehumidification systems […]