Biosolids Drying, UV Disinfection & WPCF Upgrades: Beloit, Wisconsin

The City of Beloit owns and operates the Beloit Water Pollution Control Facility (WPCF), an advanced wastewater treatment plant constructed in 1992 with a rated hydraulic capacity of 13.2 million gallons per day (mgd). The facility treats domestic, commercial, and industrial wastewater in compliance with its WPDES permit prior to discharge to the Rock River. Biosolids generated through the treatment process are stabilized and primarily recycled through agricultural land application.

Due to aging infrastructure, continued growth, and evolving regulatory requirements, the City developed a comprehensive Facility Plan to evaluate existing processes, identify deficiencies, and recommend improvements to ensure long-term reliability and regulatory compliance. Based on the findings of the Facility Plan, the City selected Donohue to design and implement critical upgrades to the WPCF.

A primary focus of the project was improvement of the facility’s disinfection and biosolids handling systems. One key deficiency identified was insufficient chlorine contact time in the existing disinfection system. To improve safety and performance, the project converted the WPCF from chlorine gas disinfection to an ultraviolet (UV) disinfection system. A Trojan Signa UV system was installed within the existing chlorine contact channels, allowing the City to repurpose existing infrastructure while accommodating peak flows of up to 28 mgd. The UV system significantly reduced chemical handling risks while providing reliable and consistent disinfection.

The project also included major upgrades to the biosolids processing facilities. Improvements to solids thickening, dewatering, and anaerobic digestion were complemented by installation of a new belt dryer system for biosolids drying. The dryer system included supporting infrastructure such as a boiler and heat exchanger system, dust control equipment, a biosolids storage silo, and a load-out system. These upgrades improve biosolids stability, reduce hauling volumes, and enhance the sustainability and efficiency of biosolids management.

Donohue supported the City in obtaining  Wisconsin Department of Natural Resources State Revolving Fund financing. The improvements, completed in 2025, modernize the WPCF, enhance operational safety and efficiency, and position the facility to meet future treatment and regulatory demands.