The City of Waukesha completed a Stormwater Management Plan to mitigate known areas of surface flooding experienced during peak rain events. Two locations were identified as needing improvements along Rolling Ridge Drive and along North University Drive in the northwest portion of the City. During most rainfall events, stormwater drains eastward through an open channel and culverts along Rolling Ridge Drive and through an open channel north of and parallel to Pebble Valley Road. During larger rainfall events, the culverts and open channels would overflow and flood the streets and backyards of residential areas.
To address these problems, the City hired Donohue to design improvements to increase the capacity of the culverts and open channels along Rolling Ridge Drive and an open channel on the east side of North University Drive, located within a drainage easement. The proposed channel design included relatively steep side slopes to maximize the channel cross-section within the limited easement area.
Donohue evaluated several options for channel lining and bank stabilization, including riprap, turf reinforcing map, and GEOWEB (a cellular confinement system). GEOWEB was selected as the best option. It requires less over-excavation (6 inches, compared with 12 to 18 inches for riprap), resulting in lower construction costs. The GEOWEB is also easier to maintain, is more aesthetically pleasing, and has a lower roughness coefficient, which produces greater channel capacity. Donohue prepared detailed construction plans, special provisions, cost estimates, and WDNR Dredging, Wetland, and Construction Site Stormwater permits.

Project map

Channel after vegetation is established

Channel after vegetation is established

Channel during construction